Trucks
 
 
 
Trucks
 
Cusco Turbovac
Cusco Turbovac
Cusco Turbovac

2012 Cusco Turbovac

2012 Cusco Turbovac DISCHARGE VALVE:    6″ Betts air operated valve with aluminum Kamlok fittings mounted on rear head. ISOLATION VALVE: 8” air operated butterfly valve between primary and cyclone with PTO interconne...
 
 
Gallery
 
Cusco Omnivac
Cusco Omnivac
Cusco Omnivac

2012 Cusco Omnivac

2012 Cusco Omnivac HYDROSTATIC TEST PRESSURE: 40.0 PSIG PRESSURE RELIEF: 4″ SS Girard pressure vent, 25 PSIG setting mounted top of tank. PRIMARY SHUT-OFF: 6″ internal shut-off with 9″ SS float ball and cage a...
 
 
Gallery
 
2012 cusco mastervac
2012 cusco mastervac
2012 cusco mastervac

2012 Cusco Mastervac

2012 Cusco Mastervac SILENCERS:    12″ intake and exhaust silencers. BLOWER PIPING: Dual 8″ diameter with 8″ quick disconnect rubber boot assembly BLOWER VALVING: 4″ brass manual vacuum relief valve a...
 

 
Gallery
 
Industrial Vac Truck
Industrial Vac Truck
Industrial Vac Truck

2012 Cusco Industrial Vac PM200

2012 Cusco Industrial Vac PM200 DISCHARGE VALVE: 6″ Betts air operated valve with aluminum Kamlok fittings mounted on rear head. ISOLATION VALVE: 4” air operated butterfly valve between primary and secondary shut-off wi...
 
 
Gallery
 

2012 Cusco Industrial Vac

2012 Cusco Industrial Vac PUMP SPECIFICATIONS: Moro PM200 liquid cooled vacuum/pressure pump, 678 CFM free air rating, 27″Hg maximum vacuum. Includes hydraulic oil cooler. DRIVE: Hydraulically driven from air shift PTO mo...
 
 
Gallery
 
2011 Presvac Powervac 3800 SS
2011 Presvac Powervac 3800 SS
2011 Presvac Powervac 3800 SS

2011 Presvac Powervac 3800 SS

2011 Presvac Powervac 3800 SS Venting: Girard 4” stainless steel 316 vent (as per D.O.T. 407 / 412) Baffle: One (1) – upper half Top Inspection Hatch: 10” with wingbolt closures, stainless steel 316 Liquid level indicator...
 

 
Rentals
 
2011 Presvac Powervac 3200 SS
2011 Presvac Powervac 3200 SS
2011 Presvac Powervac 3200 SS

2011 Presvac Powervac 3200 SS

2011 Presvac Powervac 3200 SSHydrostatic test pressure: 56 p.s.i. Maximum allowable working pressure: 35 p.s.i. Operating temperature: -20˚F to 200˚F   Overturn protection: Front, center and rear, three (3) leg support a...
 
 
Gallery
 
2011keithhuberdominator
2011keithhuberdominator
2011keithhuberdominator

2011 Keith Huber Dominator III

2011 Keith Huber Dominator III A three stage double acting hydraulic cylinder is mounted to the front head to lift the tank and provides an automatic lock when the tank is in the lowered transport position.  Trunnions installe...
 
 
Gallery
 
Tubovac 2011
Tubovac 2011
Tubovac 2011

2011 Cusco Turbovac

2011 Cusco Turbovac Design shall withstand 25-PSI internal pressure and 15 PSIG external pressure (full vacuum) and shall meet all the requirements of Section VIII Division 1 of the A.S.M.E. Boiler and Pressure Vessel Code. TAN...
 

 
Gallery
 
Cusco Omnivac
Cusco Omnivac
Cusco Omnivac

2011 Cusco Omnivac

2011 Cusco Omnivac SUCTION VALVE: 4″ Betts air operated valve at 4 o’clock position with aluminum Kamlok fittings mounted on rear head. DISCHARGE VALVE:    6″ Betts air operated valve with aluminum Kamlok fitti...