Posted November 14, 2012 by admin in New Trucks
 
 

2013 Cusco Industrial Vac PM200

2013 Cusco Industrial Truck
2013 Cusco Industrial Truck

2013 Cusco Industrial Vac PM200

HYDROSTATIC TEST PRESSURE:
40.0 PSIG

PRESSURE RELIEF:
4″ SS Girard pressure vent, 25 PSIG setting mounted top of tank.

PRIMARY SHUT-OFF:
4″ internal shut-off with 6″ SS float ball and cage assembly with neoprene rubber seat top front of tank.

BAFFLE:
One anti surge mounted on reinforcing pad.

RINGS:
Circumferential reinforcement rings with tank support feet.

OVERTURN PROTECTION:
Front, center, and rear 4″ pipe construction overturns with reinforcement pads and gussets

MANWAY:
20″ diameter located top of tank.

LIQUID LEVEL INDICATOR:
Stainless Steel construction rotary float gauge with 6” float ball assembly located on rear head.
REAR DOOR:
Hydraulic full opening rear door assembly with 6 heavy duty wing clamps, neoprene rubber rear door gasket, double acting hydraulic cylinder and safety brace.

TANK CAPACITY:
3150 USG + 3% Outage

admin